公司简介

Brief introduction of transfer station


The transfer station uses mobile garbage compression equipment with a garbage hopper, and the collection truck loads materials from the front of the transfer station. The daily processing capacity of a single machine at the transfer station is about 20 to 50 tons, which can meet the discharge of a collection truck within 3.5m³. This form is suitable for the unloading of small collection trucks. The turning space at the rear of the transfer station workshop is narrow, the side has a small space, and the front is a transfer station with a larger space.


Operation process flow chart of transfer station



Transit station construction renderings




Transfer station construction design drawings




Copyright © Yangzhou Jinwei Environmental Protection Technolog All rights reserved Record No: SU ICP No. 2021019778-1 technical support:YichengNetwork
  • home
  • telephone
  • Back